Salarpuria Sattva Senorita

2/3 BHK Apartments, 4 BHK Duplex

To know more and experience

overview

Where the location itself is a luxury!

In a world where time is of the essence, having a home in a prime location is half the battle won.
Welcome to Salarpuria Sattva Senorita. Spacious 2&3 BHK apartments & 4 BHK Duplex, with the best amenities that support your aspirations and lifestyle. Complete with landscaped walkways and open spaces, a swimming pool, health centre and a fully equipped clubhouse to round off the good life. There is a dedicated play area for your children which ensures that play time is safe and secure! Outdoor activities like cricket and tennis, along with plenty of walking spaces provide ample opportunities for everyone in the family to get in shape.

In case these luxuries weren’t enough, the location is a luxury by itself. Located on Sarjapur Main Road, opposite the WIPRO Corporate Office, Salarpuria Sattva Senorita is perched comfortably close to corporate and IT offices in and around Sarjapur Main Road, Whitefield and Electronic City. A dream location in one of Bengaluru’s most prime areas, this is a home where your workspace is near enough to give you the work-life balance you dream of.

LOCATION

Located on Sarjapur Main Road, opposite WIPRO Corporate Office, Salarpuria Sattva Senorita is perched comfortably close to corporate and IT offices in and around Sarjapur Main Road, Whitefield and Electronic City.

Salarpuria Sattva Senorita, Halanayakanahalli, Bengaluru, Karnataka, India

Specifications

  • Teakwood doorframe for main door.
  • Main door-One side teak veneer shutter with melamine polish.
  • All other door frames in Sal wood.
  • All other doors made of flush shutters with enamel painting.
  • Aluminum windows with mosquito mesh.
  • Ventilators for toilets
    Common Area

  • Lift Lobby : Granite flooring / vitrified flooring
  • Corridors : Vitrified /Granite tiles/ Ceramic tiles flooring Apartment
  • Foyer: Vitrified tiles flooring.
  • Living & Dining: Vitrified tiles flooring.
  • Bedrooms and Kitchen: Vitrified tiles flooring.
  • Balcony & Utility: Vitrified tiles flooring.Toilets
  • Ceramic tiles flooring.
  • Glazed / Ceramic tile dado up to 7″ inch height.
  • Exterior walls with textured finish (up to 5th floor only)
  • Internal walls with plastic emulsion and ceilings with oil bound distemper.

R.C.C. framed structure with porotherm blocks.

  • Chromium-plated fittings.
  • Hot and cold basin mixer for all the toilets.
  • Health Faucet for all the Toilets.
  • Granite countertop washbasin in master bathroom.
  • European Water Closet (EWC) in all Toilets.
  • Wall mixer with CP shower units in bath area for all the toilets.
  • Inlet & Outlet for washing machine and dish washer.
    Back-up Generator
  • Stand-by generator for lights in common areas, lifts & pumps.
  • Individual apartments to have a backup of 2KVA.Kitchen
  • Black granite kitchen counter
  • Hot & cold wall mixer.
  • Provision for water heater & purifier fixing Lift
  • Automatic passenger lifts
  • Teakwood doorframe for main door.
  • Main door-One side teak veneer shutter with melamine polish
  • All other door frames in Sal wood.
  • All other doors made of flush shutters with enamel painting.
  • Aluminum windows with mosquito mesh
  • Ventilators for toilets
  • Ceramic tiles flooring.

Amenities

Indoor Amenities

  • Squash Court
  • Jacuzzi
  • Health Facility with Steam & Sauna
  • Golf Simulator
  • Gymnasium
  • Indoor Games
  • Billiards / Snooker
  • Party Hall
  • Table Tennis

outdoor Amenities

  • Cricket Practice Pitch
  • Tennis court
  • Children’s Play Area
  • Open Amphitheater
  • Swimming Pool
  • Kids Pool

PROJECT PROGRESS

Progress As On

February 28, 2017

+

Progress As On

January 31, 2017

+

Progress As On

December 31, 2016

+

Progress As On

November 30, 2016

+

Progress As On

October 31, 2016

+

Progress As On

September 30, 2016

+

Progress As On

August 31, 2016

+

Progress As On

July 31, 2016

+

Progress As On

June 30, 2016

+

Progress As On

May 31, 2016

+

Progress As On

April 30, 2016

+

Progress As On

March 31, 2016

+

Progress As On

February 29, 2016

+

Progress As On

January 31, 2016

+

CONTACT US